Buth Park Lighting and Erosion Control Upgrades

Additional lighting will be added to illuminate the front of the park at three locations. A new garden type wall will be installed between the sidewalk and hill on the South West side to prevent dirt and mud from going on to the sidewalk.
table frame top
table frame left

Construction start date: June 2004
Expected completion date: June 2004
Construction Cost:

Gross square footage:
Construction By:
Project Status: On Schedule
table frame right
table frame bottom

Other Pictures (Click to Enlarge)

   
Feedback Form