Replace Chapel Transformer

There is an indentified "bad leg" by 2003 infrared. Transformer failure would result in power outage to approximately 1/4 of the campus. The existing transformer will be demolished and a new one installed. (This project has been completed, see pictures of the work done below.)
table frame top
table frame left

Construction start date: August 2004
Expected completion date: August 2004
Construction Cost: $15,000

Gross square footage:
Construction By:
Project Status: Completed
table frame right
table frame bottom